Tag: GMP Architekten
-
Olympic Stadium
The new design respects the historic fabric with its filigree pre-stressed concrete upper tier built in 1968, along with the plinth structure of the west end built in 1948.
-
Poland’s National Stadium
The interior roof consists of a mobile membrane sail that folds together above the pitch.